QUALITY 

 

Takasago Singapore’s Quality System comprises the following...

Placeholder image
--- 
 

Takasago Singapore’s project support system is to enhance and deliver reliable quality to our customers.

Placeholder imagePlaceholder image
--- 
 

Takasago Singapore utilizes an internal quality control system to ensure quality of works are maintained throughout the duration of the project. The quality control sytem is implemented for projects that are valued at S$500,000 and above.

 

Stages Of Project For Implementation of Quality Control System.

Placeholder image
 

Commencement Meeting

Meeting to identify problems, conducted prior to starting construction. Confirm the suitability of design and planning, safety, personnel deployment. At the meeting, feedback on past successes and failures to prevent recurrence of mistakes. Decide on inspection schedule. 

Progress Inspection

Inspection conducted during construction of the project. Inspect ducts and pipes, thermal insulation, wiring and the like to ensure proper working. Depending on necessity, carry out multiple times. 

Completion Inspection

Inspection carried out prior to completion of the project. Inspect the adequacy of functions of installed facilities, or whether there are problems in the operation system. 

Final Meeting

Meeting after completion of the project. Confirm as-built drawings and to determine a support system for future projects.

--- 
 

Testing And Commissioning Independent Systems

An in-house independent team from Takasago Singapore conducts testing and commissioming on projects carried out by the company to ensure customer's requirements are met. At the same time enables the project team to fully concentrate on providing quality finished product to the customers.

Tasks of the team are:

1. Testing, Measurement & Adjustment.

  🗸 Total Balance of System.
  🗸 Maximum Performance of System & Each Equipment.
  🗸 Performance of Individual Item.

2. Report T & C results according to T & C standard format.

3. Standardize T & C method & result for all project.

4. To train on T & C, Technical, Shop Drawing Skills as well as make new communication for T&C member & all staff.

Final Guarantee of Takasago's Product Quality to customer

--- 
 

Through its many years of continuous cleanroom projects, Takasago Singapore has the experience and expertise to always offer customers with the most competetive prices. This are acheived throught its design review and project management.

 
Placeholder image
--- 
 

In our effort to complete fast paced projects on time, work safety is never forgotten. Takasago views safety as a serious matter and reinforces in-house safety awareness through implementation of the following :

Safety Handbook

Safety standards compiled from Takasago’s safety practices.

Safety Patrol

Management takes part in a monthly safety patrol.

Safety Sub-Contractor Meeting

Management of Takasago’s sub-contractors takes part in twice yearly meetings to share Takasago and MOM’s latest information.

Safety In-House Training

Yearly safety training that covers not only safety knowledge, but safety-related construction methods and work attitude, as well as methods for constructing project safety systems.

External Safety Training

Safety training held at MOM, targeted at all staff.

Construction Safety Supervisor | Safety Course For Project Manager | Risk Assessment Course

Risk Assessment

Standardize risk assessment methods accumulated from experience and to turn them toward each site’s development.

--- 
 

The subcontractors who support Takasago Singapore not only have a long track record in quality cleanroom construction, but are thorough in safety management and following cleanroom protocol. Takasago Singapore has a control system that assesses new and existing vendor’s capability and ensures that approved vendor maintains the required standard.

Vendor Pre-Qualification

Submit Vendor Pre-Qualification for management approval.

Approved Vendor List

Upon approval, new vendors are included in the company Approved Vendor List.

Yearly Evaluations of Vendor's Performance

Evaluate Approved Vendor’s performance yearly.

Black Listed Vendor

Under performing vendors are place in the Black-listed Vendor List.

---